Commercial Floor Preparation & Removal Melbourne

The quality and longevity of any commercial flooring installation depends on what lies beneath it. A new carpet tile or vinyl floor installed over an uneven, damp, or contaminated subfloor will fail prematurely — regardless of how good the product is. That is why Commercial Floors treats floor preparation as one of the most critical stages of every project.

Our Floor Preparation Services

A square frame containing a scattering of small, black circular and oval shapes on a white background.

Old Flooring Removal

We remove existing carpet, vinyl, tiles, and adhesive residues. All waste is disposed of responsibly. We assess the exposed subfloor condition before proceeding with preparation.

A square sticker with one corner peeling up, depicted as a simple black-and-white line drawing.

Subfloor Levelling

We apply self-levelling compound to correct uneven concrete or timber subfloors. Even minor undulations can cause visible imperfections in finished flooring, particularly with vinyl and LVP.

A digital thermometer probe inserted into a pile of soil or compost.

Moisture Testing & Treatment

Excess moisture in concrete slabs is one of the most common causes of flooring failure. We test moisture levels to Australian Standards and apply appropriate moisture barriers or treatments when required.

An icon of two overlapping rectangular pages, each patterned with multiple small circles.

Surface Grinding & Smoothing

For subfloors with adhesive residue, high spots, or surface irregularities, we use diamond grinding equipment to create a smooth, level surface suitable for new flooring installation.

A hand holding a trowel, applying mortar or plaster over a brick wall.

Crack Repair

Cracks in concrete subfloors are filled and repaired to prevent them from telegraphing through to the finished floor surface.

A black, circular loading icon consisting of twelve dashed lines arranged in a ring.

Priming

Appropriate primers are applied to ensure optimal adhesion between the subfloor and the flooring product or adhesive system.

Why Floor Preparation Matters

Skipping or rushing floor preparation is the single biggest cause of premature flooring failure in commercial environments. Proper preparation ensures the flooring product bonds correctly, lies flat without bubbles or lifting, wears evenly, and achieves its full expected lifespan. At Commercial Floors, we never cut corners on preparation — it is built into our standard process for every project.

Frequently Asked Questions

  • Do I need floor preparation before new commercial flooring?

    In most cases, yes. The extent of preparation depends on your existing subfloor condition. At minimum, the subfloor needs to be clean, dry, and level. We assess subfloor condition during our free site consultation and include any necessary preparation in our quote.

  • How long does floor preparation take?

    Floor preparation typically takes half a day to two days depending on the scope: simple cleaning and priming is fast, while levelling compound application requires 24 hours curing time. We factor preparation time into every project schedule.

  • Is old flooring removal included in your quotes?

    Yes. When old flooring removal is required, we include it in our comprehensive quote. This covers removal, disposal, and any subfloor preparation needed before the new flooring is installed.

Get a Free Quote Today

Call us on 0419 810 810 or request a free measure and quote. We come to you — anywhere in Melbourne and regional Victoria.